Te Pae construction site

Image
Te Pae construction site

Te Pae construction site

Photographer's note: This construction spans two blocks bounds by Armagh Street, Oxford Terrace, Cathedral Square and Colombo Street. This is managed by crown rebuild agency Ōtākaro Limited and built by CPB Contractors. Developing Convention Centre.
Note
Images of the people, communities and landscape of Christchurch central city, taken by Thomas Herman, between March and September 2018. The Four Avenues project was a collaboration between Christchurch City Libraries and the University of Canterbury, School of Fine Arts to create a documentary photographic record of the wider central city area.

Rights

In copyright

Licence Text
This item is in copyright; permission for reuse must be obtained from the creator.
Re-use Text
Under the Copyright Act 1994 works cannot be copied, shared or reused other than for the purpose of fair dealing. The Copyright Act 1994 allows fair dealing with a work for the purposes of research or private study (e.g. school projects or private family research).

It is the responsibility of the user to obtain clearance from the copyright holder.

Extra fields

UUID
572f1415-7bce-4cf5-a7c0-298e6193229d